
From subfloor preparation to final finishing.
One range for the key stages of flooring installation.
01 Preparation · 02 Levelling · 03 Bonding · 04 Final finishing
Professional solutions for flooring installation.

Primers and epoxy moisture barriers for substrate preparation.
View →
Repair of damage and local levelling of the substrate.
View →
Levelling of larger areas before the covering is laid.
View →
Adhesives for resilient and textile floor coverings.
View →
Hybrid SMP adhesives for three-layer and solid parquet.
View →
Final finish and protection of the completed floor surface.
View →MATERIAL · LABOUR · TIME · SITE VISITS · DOWNTIME



Area · Floor type · Subfloor type · Subfloor condition · Contact
Request a project quote →